06 / SectorWater & environment

« Water and sanitation are visible needs. »

Immediate urban and semi-urban needs. EPC, operation, concession tickets.

Field photo — Water & environment
ProvisionalMarket read

Sector indicators — provisional

~46%

Access to drinking water

4

Priority cities (Bangui, Berbérati, Bouar, Bambari)

8+

WASH projects under structuring

15 years

National water plan

01Why now

An identified market tension.

Immediate urban and semi-urban needs. EPC, operation, concession tickets.

Entry points exist at several levels. The delegation makes it possible to qualify the real priorities, their maturity, and the relevant technical counterparts.

02Value creation

Three structuring entry points.

01Produce

Produce

Abstraction, pumping, treatment, storage, distribution.

02Sanitate

Sanitate

Drainage, stormwater, networks, rehabilitation.

03Recover

Recover

Waste, biomass, maintenance, supervision.

03Relevant profiles

Who should come.

01Water EPCs
02Concessionaires
03Equipment suppliers
04Waste management
05Green donors
06City advisory
04What you come to find in Bangui
01

Reading of priorities

Maturity, calendar, counterparts.

02

Identifying counterparts

Authorities, operators, local partners.

03

Outbound action plan

Documentation, technical mission, calendar.

05Possible entry formats

Four compatible modes.

01

Invest

Equity contribution, participation, JV.

02

Deliver

EPC contract, supply, equipment.

03

Operate

Concession, operation, O&M.

04

Structure

Advisory mandate, structuring, financing.

06Flagship projects

Three files to qualify on site.

Bangui water supply · phase 2
Under study

Bangui water supply · phase 2

Network extension and new abstraction field. Doubling of urban capacity.

Regional treatment stations
Pilot phase

Regional treatment stations

Three potabilisation units for secondary regional capitals.

Bangui drainage rehabilitation
To be structured

Bangui drainage rehabilitation

Overhaul of drainage channels and retention basins. Rainfall resilience.

Illustrative projects — final selection set with the Central African counterpart.

07Regulatory framework

A framework being built.

Standard PPAs, tariffs, guarantee mechanisms. The pieces are falling into place. The exact reading is done on site, with the relevant counterparts.

  • Energy framework law · 2024 revision under implementation
  • Investment code · 10-year stability
  • PPA mechanism · standard framework being finalised
  • Partial risk guarantee · co-instruction with partners
  • Tariff structure · progressive tariff review
08The mission

5 days in Bangui · covered from Addis Ababa onwards.

  • Base package · 2 representatives per company
  • Single-room add-on
  • Additional representatives possible
  • Flight country of origin → Addis not included
View the mission
Sector Water & environment · Bangui DelegationApply