Boali · hydro rehabilitation
Historic plant on the Mbali. Rehabilitation and capacity extension.
Sectors·Energy
Generation, grids, local access — demand spans the entire chain.
Sector indicators — provisional
~15%
National electrification rate
3
Priority regions identified
12+
Projects under structuring
25 years
Horizon of framework PPAs
Generation, grids, local access — demand spans the entire chain.
Entry points exist at several levels. The delegation makes it possible to qualify the real priorities, their maturity, and the relevant technical counterparts.
01 — Generation assets
Hydro, solar, hybrid, gensets, storage.
02 — Grids
Substations, lines, distribution, metering, supervision.
03 — Services
Maintenance, parts, performance, operation, training.
Maturity, calendar, counterparts.
Authorities, operators, local partners.
Documentation, technical mission, calendar.
01
Equity contribution, participation, JV.
02
EPC contract, supply, equipment.
03
Concession, operation, O&M.
04
Advisory mandate, structuring, financing.
Historic plant on the Mbali. Rehabilitation and capacity extension.
Progressive coverage of 3 target regions. PV-battery-diesel hybrid.
Bangui grid densification · structuring link to the southern zone.
Illustrative projects — final selection set with the Central African counterpart.
Standard PPAs, tariffs, guarantee mechanisms. The pieces are falling into place. The exact reading is done on site, with the relevant counterparts.