01 / SectorEnergy

« In CAR, energy is an immediate need. »

Generation, grids, local access — demand spans the entire chain.

Field photo — Energy
ProvisionalMarket read

Sector indicators — provisional

~15%

National electrification rate

3

Priority regions identified

12+

Projects under structuring

25 years

Horizon of framework PPAs

01Why now

An identified market tension.

Generation, grids, local access — demand spans the entire chain.

Entry points exist at several levels. The delegation makes it possible to qualify the real priorities, their maturity, and the relevant technical counterparts.

02Value creation

Three structuring entry points.

01Generation assets

Generation assets

Hydro, solar, hybrid, gensets, storage.

02Grids

Grids

Substations, lines, distribution, metering, supervision.

03Services

Services

Maintenance, parts, performance, operation, training.

03Relevant profiles

Who should come.

01IPP producers
02Electrical EPCs
03Grid equipment suppliers
04O&M / operators
05Infrastructure funds
06Guarantors & insurers
04What you come to find in Bangui
01

Reading of priorities

Maturity, calendar, counterparts.

02

Identifying counterparts

Authorities, operators, local partners.

03

Outbound action plan

Documentation, technical mission, calendar.

05Possible entry formats

Four compatible modes.

01

Invest

Equity contribution, participation, JV.

02

Deliver

EPC contract, supply, equipment.

03

Operate

Concession, operation, O&M.

04

Structure

Advisory mandate, structuring, financing.

06Flagship projects

Three files to qualify on site.

Boali · hydro rehabilitation
Under study

Boali · hydro rehabilitation

Historic plant on the Mbali. Rehabilitation and capacity extension.

Regional solar mini-grids
Pilot phase

Regional solar mini-grids

Progressive coverage of 3 target regions. PV-battery-diesel hybrid.

Priority MV backbone
To be structured

Priority MV backbone

Bangui grid densification · structuring link to the southern zone.

Illustrative projects — final selection set with the Central African counterpart.

07Regulatory framework

A framework being built.

Standard PPAs, tariffs, guarantee mechanisms. The pieces are falling into place. The exact reading is done on site, with the relevant counterparts.

  • Energy framework law · 2024 revision under implementation
  • Investment code · 10-year stability
  • PPA mechanism · standard framework being finalised
  • Partial risk guarantee · co-instruction with partners
  • Tariff structure · progressive tariff review
08The mission

5 days in Bangui · covered from Addis Ababa onwards.

  • Base package · 2 representatives per company
  • Single-room add-on
  • Additional representatives possible
  • Flight country of origin → Addis not included
View the mission
Sector Energy · Bangui DelegationApply