Langue · Language · 语言

Join

Sectors·Digital

05 / SectorDigital

« Digital is a state-level undertaking. »

Digital sovereignty, backbone, identity, public IS, connectivity.

Field photo — Digital
ProvisionalMarket read

Sector indicators — provisional

~15%

National internet penetration

3

Main cities connected by fibre

1

Active international backbone (via Cameroon)

5 years

National digital strategy

01Why now

An identified market tension.

Digital sovereignty, backbone, identity, public IS, connectivity.

Entry points exist at several levels. The delegation makes it possible to qualify the real priorities, their maturity, and the relevant technical counterparts.

02Value creation

Three structuring entry points.

01Build

Build

Fibre, backbone, data, equipment, coverage.

02Run

Run

Integration, hosting, operation, support.

03Secure

Secure

Identity, KYC, cybersecurity, digital trust.

03Relevant profiles

Who should come.

01Telecom operators
02Integrators
03Sovereign cloud
04Cyber
05Fintech & ID
06State IS advisory
04What you come to find in Bangui
01

Reading of priorities

Maturity, calendar, counterparts.

02

Identifying counterparts

Authorities, operators, local partners.

03

Outbound action plan

Documentation, technical mission, calendar.

05Possible entry formats

Four compatible modes.

01

Invest

Equity contribution, participation, JV.

02

Deliver

EPC contract, supply, equipment.

03

Operate

Concession, operation, O&M.

04

Structure

Advisory mandate, structuring, financing.

06Flagship projects

Three files to qualify on site.

Bangui–Berbérati fibre backbone
Under study

Bangui–Berbérati fibre backbone

Structuring south-west link. Digital opening up of regional capitals.

Sovereign digital identity
Pilot phase

Sovereign digital identity

Sovereign identity platform. Foundational building block for digital trust.

Tier-III sovereign data center
To be structured

Tier-III sovereign data center

Hosting of critical public IS. Compliance and service continuity.

Illustrative projects — final selection set with the Central African counterpart.

07Regulatory framework

A framework being built.

Standard PPAs, tariffs, guarantee mechanisms. The pieces are falling into place. The exact reading is done on site, with the relevant counterparts.

  • Energy framework law · 2024 revision under implementation
  • Investment code · 10-year stability
  • PPA mechanism · standard framework being finalised
  • Partial risk guarantee · co-instruction with partners
  • Tariff structure · progressive tariff review
08The mission

5 days in Bangui · covered from Addis Ababa onwards.

  • Base package · 2 representatives per company
  • Single-room add-on
  • Additional representatives possible
  • Flight country of origin → Addis not included
View the mission
Sector Digital · Bangui DelegationApply