Bangui–Bouar road rehabilitation
Vital axis to Cameroon. Sections in very poor condition, to be rebuilt.
Sectors·Infrastructure & logistics
Logistics corridor, structuring internal links, materials and operation.
Sector indicators — provisional
2
Strategic corridors (Douala–Bangui, Pointe-Noire–Bangui)
7,000 km
Classified road network
1
International airport platform (M'Poko)
10 years
National infrastructure investment plan
Logistics corridor, structuring internal links, materials and operation.
Entry points exist at several levels. The delegation makes it possible to qualify the real priorities, their maturity, and the relevant technical counterparts.
01 — Build
Roads, bridges, structures, logistics bases.
02 — Supply
Cement, aggregates, testing, equipment, supervision.
03 — Operate
Maintenance, concession, corridor services.
Maturity, calendar, counterparts.
Authorities, operators, local partners.
Documentation, technical mission, calendar.
01
Equity contribution, participation, JV.
02
EPC contract, supply, equipment.
03
Concession, operation, O&M.
04
Advisory mandate, structuring, financing.
Vital axis to Cameroon. Sections in very poor condition, to be rebuilt.
Structuring link to the DRC. Opening up of the south-east zone.
River-road-air hub. Pooled logistics for the Douala corridor.
Illustrative projects — final selection set with the Central African counterpart.
Standard PPAs, tariffs, guarantee mechanisms. The pieces are falling into place. The exact reading is done on site, with the relevant counterparts.